First Project: 10 x 30 Concrete Pad
Students prep, build the foundation, pour the concrete, and perfectly finish the 10x30 concrete pad at the Salem High School. The project was a first for the class – and the first step in their journey through the Construction Trades Program, which began in September 2018 with private funds.